Renovating a condo bathroom: the strata checklist

Updated November 2026

In a condo, the renovation starts long before the first tile comes off. Most delays we see are not construction problems; they are strata steps that were left to the last minute. Here is the order we work through them with our condo clients.

1. Read your bylaws first

Look for anything about alterations, renovations, flooring, noise and moving hours. Some buildings need approval for any work that touches plumbing, walls or floors; others only for structural changes. Your strata manager can send you the current bylaws and rules.

2. Submit an alteration request

Most stratas have a form. It usually asks for a description of the work, a rough schedule, and who is doing it. We give you a written scope you can attach.

3. Send the contractor’s insurance certificate

The strata will want proof that your renovator carries liability insurance, often naming the strata corporation. Ask for this early; we send ours as soon as you book.

4. Plan the noisy days

Demolition is the loud part and usually takes one or two days. Stratas set allowed hours for noisy work, often weekdays only. We schedule around them.

5. Book the elevator and parking

Many buildings need the elevator booked with protective pads for deliveries and debris, sometimes with a deposit. Ask about loading-bay and visitor parking for trades.

6. Arrange water shut-offs

If your unit has no shut-off of its own, the building may need to shut water to a whole stack. That is usually booked with notice to your neighbours through the building manager.

7. Take waterproofing seriously

A leak in a condo is your neighbour’s problem too, and often yours to pay for. A proper membrane under and behind every wet surface is the most important thing you will never see.

8. Check flooring rules

Some buildings require an acoustic underlay under new hard flooring, and some need approval for it. Ask before choosing tile.

9. Debris and clean-up

Building garbage rooms are not for renovation debris. Your renovator should carry it out and keep hallways clean every day.

10. Close it out

Some stratas want to be told when the work is finished, or to inspect common areas. Keep your permit sign-offs and warranty with your strata records.

Book a free site visit

Tell us about the room. VR or his son will call you back to set a time that suits you.

  • No cost, no obligation
  • Fixed written quote, three options
  • AI design preview of your room
  • Financing available
  • Fully insured, written warranty

Prefer to talk? 604-729-0426

CallFree estimate