604-729-0426

Kitchens, built to be cooked in

New cabinets, counters, backsplash, lighting and floors. We order cabinets early, so the long wait happens before we open up your kitchen, not during.

Typical time
4–8 weeks
Cabinets
Ordered early
Site visit
Free
Design idea: kitchen with navy shaker lower cabinets, white quartz counters and an island with stoolsDesign idea · AI rendering

What a kitchen estimate covers

Itemized, so you can see where the money goes.

  1. 01

    Design and layout

    Measurements, layout and a cabinet plan before anything is ordered.

  2. 02

    Demolition and haul-away

    Old cabinets, counters and flooring removed.

  3. 03

    Plumbing and electrical

    Sink, dishwasher, lighting and outlets moved or added, with permits where needed.

  4. 04

    Cabinets and countertops

    Supplied and installed, levelled and adjusted.

  5. 05

    Backsplash and flooring

    Tile and floors finished to the cabinets.

  6. 06

    Paint, trim and clean-up

    Walls, ceiling and trim finished, the room cleaned.

  7. 07

    Written warranty

    Our workmanship guarantee, on paper.

How it works, start to finish

Four steps, with dates you can plan around. No surprises once the walls are open.

  1. 01

    Ballpark online

    2 minutes

    Use the estimate above or send us a few photos. You get a realistic range before anyone visits.

  2. 02

    Free site visit

    When it suits you

    VR measures the room, checks what is behind the walls where he can, and talks through options with you.

  3. 03

    Fixed written quote

    After the visit

    Three options side by side (standard, mid-range, premium), every line itemized, with an AI design preview of your own bathroom. Financing available.

  4. 04

    Build and walkthrough

    3–6 weeks on site

    A clean, protected site, regular updates, and a final walkthrough before your written warranty is signed over.

Questions people ask first

How long does a kitchen renovation take?

Usually 4 to 8 weeks of work on site. Custom cabinets can take 6 to 10 weeks to arrive, which is why we order them as early as possible.

Can we keep using the kitchen during the work?

Not for most of it. We help you set up a temporary kitchen elsewhere in the house and give you a schedule so you know when it comes back.

Do you do kitchens in condos?

Yes, with the same strata process we use for condo bathrooms.

Book a free site visit

Tell us about the room. VR or his son will call you back to set a time that suits you.

  • No cost, no obligation
  • Fixed written quote, three options
  • AI design preview of your room
  • Financing available
  • Fully insured, written warranty

Prefer to talk? 604-729-0426

CallFree estimate